AS/NZS 3666.1:2011 · Air-handling and water systems of buildings - Microbial control - Part 1: Design, installation and commissioning
Definitions
Sub-clauses
- 1.5.1Aerosol
- 1.5.2Air filter
- 1.5.3Air-handling plant
- 1.5.4Air-handling system
- 1.5.5Air intake
- 1.5.6Air outlet
- 1.5.7Approved and approval
- 1.5.8Automatically controlled (water treatment)
- 1.5.9Biocide
- 1.5.10Bleed-off (or blowdown)
- 1.5.11Building
- 1.5.12Clean
- 1.5.13Coil
- 1.5.14Commissioning
- 1.5.15Competent person
- 1.5.16Cooling tower
- 1.5.17Cooling water system
- 1.5.18Corrosion resistant
- 1.5.19Dead-leg
- 1.5.20Drift
- 1.5.21Duct
- 1.5.22Ductwork
- 1.5.23Evaporative air-cooling equipment
- 1.5.24Evaporative condenser
- 1.5.25Exhaust air outlet
- 1.5.26Hot water
- 1.5.27Humidifier
- 1.5.28Humidifier fever
- 1.5.29Hypersensitivity pneumonitis
- 1.5.30Objectionable exhaust discharges
- 1.5.31Installation
- 1.5.32Legionnaires' disease
- 1.5.33May
- 1.5.34Pontiac fever
- 1.5.35Recirculation
- 1.5.36Regulatory authority
- 1.5.37Shall
- 1.5.38Should
- 1.5.39Terminal unit
- 1.5.40Tundish
- 1.5.41Warm water
Korbel lists only the clause number and title for reference. It does not reproduce the text of AS/NZS 3666.1:2011. Always refer to the official published standard.
Comments
Sign in as an individual to comment.