AS/NZS 3666.1:2011
Air-handling and water systems of buildings - Microbial control - Part 1: Design, installation and commissioning
Standards New Zealand
Pick a clause from the contents on the left to see community comments and worked examples, or jump into a section below.
Sections
- 1Scope and General
- 2Design, Installation and Commissioning of Air-Handling Systems
- 3Design, Installation and Commissioning of Heated Water Systems
- 4Design, Installation and Commissioning of Cooling Water Systems
- AGuidelines for the Use of Personal Protective Equipment during Commissioning of Cooling Water Systems