NZS 6806:2010 · Acoustics - Road-traffic noise - New and altered roads
Noise Mitigation and Assessment
Sub-clauses
- A1Introduction
- A2Example 1 – Altered Road – Alteration of an Existing Road in an Urbanenvironment Involving the Provision of an Additional Traffic Lane
- A3Example 2 – New Roaddevelopment of a New Road in a Rural ‘Greenfield’ Environment
- A4Example 3 – Altered Road – Special Casedevelopment of a New Intersection to Connect a New Road and Anexisting Road in a Rural Environment
- A5Example 4 – Altered Roadalteration of an Existing Road in an Urban Environment Involving Thereplacement of a Roundabout with a Signalised Intersection
- A1– Example 1 – Step A2.1 Assessment details – Existing – Current roadlayout at date of assessment
- A2– Example 1 – Step A2.1 Results – Existing – Current road layout at dateof assessment
- A3– Example 1 – Step A2.2 Assessment details – Do-nothing – Current roadlayout at design year
- A4– Example 1 – Step A2.2 Results – Do-nothing – Current road layout atdesign year
- A5– Example 1 – Step A2.3 Assessment details – Do-minimum – Future roadlayout at design year without specifi c noise mitigation
- A6– Example 1 – Step A2.3 Results – Do-minimum – Future road layout atdesign year without specifi c noise mitigation
- A7– Example 1 – Step A2.4 Assessment details – Mitigation option 1 – Futureroad layout at design year with noise mitigation
- A8– Example 1 – Step A2.4 Results – Mitigation option 1 – Future road layout at design year with noise mitigation
- A9– Example 1 – Step A2.5 Assessment details – Mitigation option 2 – Futureroad layout at design year with noise mitigation
- A10– Example 1 – Step A2.5 Results – Mitigation option 2 – Future road layout at design year with noise mitigation
- A11– Example 1 – Mitigation option details
- A12– Example 1 – Comparison of mitigation options
- A13– Example 2 – Step A3.1 Results – Existing noise environment – Greenfi eldsituation at date of assessment
- A14– Example 2 – Step A3.2 Assessment details – Do-minimum noiseenvironment – New road layout at design year without specifi c noise mitigation
- A15– Example 2 – Step A3.2 Results – Do-minimum noise environment –New road layout at design year without specifi c noise mitigation
- A16– Example 2 – Step A3.3 Assessment details – Mitigation option 1 – Newroad layout at design year with noise mitigation
- A17– Example 2 – Step A3.3 Results – Mitigation option 1 – New road layout at design year with noise mitigation
- A18– Example 2 – Step A3.4 Assessment details – Mitigation option 2 – Newroad layout at design year with noise mitigation
- A19– Example 2 – Step A3.4 Results – Mitigation option 2 – New road layout at design year with structural noise mitigation
- A20– Example 2 – Mitigation option details
- A21– Example 2 – Comparison of mitigation options
- A22– Example 3 – Step A4.1 Assessment details – Existing noise environment– Current road layout at date of assessment
- A23– Example 3 – Step A4.1 – Results – Existing noise environment – Currentroad layout at date of assessment
- A24– Example 3 – Step A4.2 Assessment details – Do-nothing environment– Current road layout at design year
- A25– Example 3 – Step A4.2 Results – Do-nothing noise environment –Current road layout at design year
- A26– Example 3 – Step A4.3 Assessment details – Do-minimum noiseenvironment – New intersection at design year without specifi c noise mitigation
- A27– Example 3 – Step A4.3 Results – Do-minimum noise environment –New intersection at design year without specifi c noise mitigation
- A28– Example 3 – Step A4.4 Assessment details – Mitigation option 1 – Newroad intersection at design year with noise mitigation
- A29– Example 3 – Step A4.4 Results – Mitigation option 1 – New intersection at design year with structural noise mitigation
- A30– Example 3 – Step A4.5 Assessment details – Mitigation option 2 – Newintersection at design year with noise mitigation
- A31– Example 3 – Step A4.5 Results – Mitigation option 2 – New intersection at design year with noise mitigation
- A32– Example 3 – Step A4.5 Assessment details – Mitigation option 3 – Newintersection at design year with noise mitigation
- A33– Example 3 – Step A4.6 Results – Mitigation option 3 – New intersection at design year with noise mitigation
- A34– Example 3 – Mitigation option details
- A35– Example 3 – Comparison of mitigation options
- A36– Example 4 – Step A5.1 Assessment details – Existing noise environment– Current road layout at date of assessment
- A37– Example 4 – Step A5.1 Results – Existing noise environment – Currentroad layout at date of assessment
- A38– Example 4 – Step A5.2 Assessment details – Do-nothing noiseenvironment – Current road layout at design year
- A39– Example 4 – Step A5.2 Results – Do-nothing noise environment –Current road layout at design year
- A40– Example 4 – Step A5.3 Assessment details – Do-minimum noiseenvironment – Future road layout at design year without specifi c noise mitigation
- A41– Example 4 – Step A5.3 Schematic representation – Do-minimum noiseenvironment – Future road layout at design year without specifi c noise mitigation
- A42– Example 4 – Step A5.4 Assessment details – Mitigation option 1 –Future road layout at design year with noise mitigation
- A43– Example 4 – Step A5.4 Results – Mitigation option 1 – Future road layout at design year with noise mitigation
- A44– Example 4 – Step A5.5 Assessment details – Mitigation option 2 –Future road layout at design year with noise mitigation
- A45– Example 4 – Step A5.5 Results – Mitigation option 2 – Future road layout at design year with noise mitigation
- A46– Example 4 – Step A5.6 Assessment details – Mitigation option 3 –Future road layout at design year with noise mitigation
- A47– Example 4 – Step A5.6 Results – Mitigation option 3 – Future road layout at design year with noise mitigation
- A48– Example 4 – Mitigation option details
- A49– Example 4 – Comparison of mitigation options
- A1– Example 1 – Step A2.1 – Schematic representation – Existing – Currentroad layout at date of assessment
- A2– Example 1 – Step A2.2 – Schematic representation – Do-nothing –Current road layout at design year
- A3– Example 1 – Step A2.3 – Schematic representation – Do-minimum –Future road layout at design year without specifi c noise mitigation
- A4– Example 1 – Step A2.4 – Schematic representation – Mitigation option 1 –Future road layout at design year with noise mitigation
- A5– Example 1 – Step A2.5 – Schematic representation – Mitigation option 2 –Future road layout at design year with noise mitigation
- A6– Example 2 – Step A3.1 – Schematic representation – Existing noiseenvironment – Greenfi eld situation at date of assessment
- A7– Example 2 – Step A3.2 – Schematic representation – Do-minimum noiseenvironment – New road layout at design year without specifi c noise mitigation
- A8– Example 2 – Step A3.3 – Schematic representation – Mitigation option 1 –New road layout at design year with noise mitigation
- A9– Example 2 – Step A3.4 – Schematic representation – Mitigation option 2 –New road layout at design year with noise mitigation
- A10– Example 3 – Step A4.1 – Schematic representation – Existing noiseenvironment – Current road layout at date of assessment
- A11– Example 3 – Step A4.2 – Schematic representation – Do-nothing noiseenvironment – Current road layout at design year
- A12– Example 3 – Step A4.3 – Schematic representation – Do-minimumnoise environment – New intersection at design year without specifi c noisemitigation
- A13– Example 3 – Step A4.4 – Schematic representation – Mitigation option 1 –New intersection at design year with noise mitigation
- A14– Example 3 – Step A4.5 – Schematic representation – Mitigation option 2 –New intersection at design year with noise mitigation
- A15– Example 3 – Step A4.6 – Schematic representation – Mitigation option 3 –New intersection at design year with noise mitigation
- A16– Example 4 – Step A5.1 – Schematic representation – Existing noiseenvironment – Current road layout at date of assessment
- A17– Example 4 – Step A5.2 – Schematic representation – Do-nothing noiseenvironment – Current road layout at design year
- A18– Example 4 – Step A5.3 – Schematic representation – Do-minimumnoise environment – Future road layout at design year without specifi c noisemitigation
- A19– Example 4 – Step A5.4 – Schematic representation – Mitigation option 1 –Future road layout at design year with noise mitigation
- A20– Example 4 – Step A5.5 – Schematic representation – Mitigation option 2 –Future road layout at design year with noise mitigation
- A21– Example 4 – Step A5.6 – Schematic representation – Mitigation option 3 –Future road layout at design year with noise mitigation
Korbel lists only the clause number and title for reference. It does not reproduce the text of NZS 6806:2010. Always refer to the official published standard.
Comments
Sign in as an individual to comment.