NZS 4404:2010 · Land development and subdivision infrastructure
Water Supply
Sub-clauses
- 6.1Scope
- 6.2General requirements
- 6.3Design
- 6.4Approval of proposed infrastructure
- 6.5Construction
- 6.1Empirical guide for principal main sizing
- 6.2Empirical guide for sizing rider mains
- 6.3Clearances between water mains and underground services
- 6.4Minimum clearance from structures
- 6.5Valve spacing criteria
- 6.6Minimum scour size
- 6.1Branch valve adjacent to main
- 6.3Secure connection
- 6.4Elimination of termination points
- 6.5Looped and link principal mains
Korbel lists only the clause number and title for reference. It does not reproduce the text of NZS 4404:2010. Always refer to the official published standard.
Comments
Sign in as an individual to comment.