NZS 3104:2021 · Specifications for concrete production
Provisions for Ready-Mixed Concrete
Sub-clauses
- 2.1General
- 2.2Inspection facilities
- 2.3Technical control
- 2.4Supervision
- 2.5Materials
- 2.6Batching plant
- 2.7Measurement of materials
- 2.8Weighing equipment
- 2.9Concrete mixing
- 2.10Transportation
- 2.11Responsibility for mix design
- 2.12Mixing records
- 2.13Concrete mixes – General requirements
- 2.14Target mean strengths and variability control
- 2.15Control tests and their evaluation
- 2.16Quality audit
Korbel lists only the clause number and title for reference. It does not reproduce the text of NZS 3104:2021. Always refer to the official published standard.
Comments
Sign in as an individual to comment.