Other🇳🇿 New Zealand
Regional Liquefaction Vulnerability Assessment — Method Statement
By Ministry of Business, Innovation & Employment (MBIE) · 2017
a liquefaction vulnerability study at a regional (or detailed technical guidance on liquefaction analysis or district) level in accordance with the Ministry of Building, earthquake engineering.
Open guide
Opens the guide on the author’s website. Korbel does not host the document.
Comments
Sign in as an individual to comment.