Waitohi Picton Ferry Redevelopment
The Waitohi Picton Ferry Redevelopment is rebuilding the Interislander ferry precinct in Picton for the new rail-enabled ferries due to replace the Cook Strait fleet by 2029. The work includes a new wharf, a new linkspan and ferry interface for rail-enabled ships, a seawall, civil works and better links to the ferry terminal. The Picton works are estimated at $531 million of the $1.867 billion Cook Strait Ferry Replacement Programme, with the port's share capped at $110 million. Work began in January 2026 with the demolition of the old 250-metre vehicle access bridge, with about 90 percent of its material recycled. Demolition of the existing linkspan at No. 2 Long Arm Wharf follows to clear the site for the new wharf.
Timeline
Jan 2026
Construction started with demolition of the old vehicle access bridge.
Apr 2026
Marlborough District Council opened consultation on financing the port's $110 million share of the project.
2029
The new ferries the redevelopment serves are due to enter service by 2029.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll