Tūparikino Active Community Hub
The Tūparikino Active Community Hub is a new indoor sports centre for New Plymouth, built on the raceway site next to TSB Stadium. The first stage is an indoor arena with six netball or basketball courts that can be set up as 12 volleyball, 16 badminton or three futsal courts, with an upper level for community groups, a café and event space. The façade is based on two interlocking woven eel nets, reflecting the shared history of the two local hapū. The hub was scaled back from a much larger plan after costs rose, and the council set aside up to $50 million for it. The raceway's old public stand was demolished in 2025, construction of the arena was due to start in May 2026, and opening is planned for early 2028.
Timeline
2024
Groundworks started on the site in late 2024.
May 2024
New Plymouth District Council approved a staged version of the hub in its 10-year plan.
Dec 2024
Taranaki Racing signed a 33-year lease to keep sharing the site, allowing the old public stand to be removed.
Mar 2025
The public stand at New Plymouth Raceway was demolished to clear the way for the indoor stadium.
25 Mar 2026
The construction contract for the indoor arena was awarded and the façade design was released.
May 2026
Construction of the indoor arena was scheduled to start.
2028
The hub is planned to open in early 2028.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll