Tihori Solar Farm
Tihori Solar Farm, first known as the Edgecumbe Solar Farm, is being built on a 209-hectare rural site about 2.5km northeast of Edgecumbe. About 220,000 solar panels will be mounted on single-axis trackers that follow the sun, giving a capacity of 136MWp and about 238GWh of electricity a year. The $236 million project was marked with a sod-turning on 13 March 2026, when construction formally began. A new 33kV line will connect the farm to the Edgecumbe substation. More than 100 construction jobs are expected, and the solar farm is due to be operating by mid-2027 with a design life of at least 35 years.
Timeline
13 Mar 2026
A sod-turning was held and construction formally began.
2027
The solar farm is expected to be operating by mid-2027.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll