Te Puke Wastewater Treatment Plant
The new Te Puke Wastewater Treatment Plant replaces the town's 1987 plant on Gordon Street, which is too small for growth and does not meet current discharge or seismic standards. The first stage will serve about 13,000 people and the first stage of the Rangiuru Business Park, with room for a second stage that futureproofs the plant to at least 2054. The plant uses sequencing batch reactor technology, treating wastewater in single tanks through cycles of filling, aeration, settling and draining. At $96 million it is the Western Bay of Plenty District Council's largest capital project. Earthworks began in January 2026, concrete pours and tank walls followed mid-year, and the plant is expected to be running in early 2028.
Timeline
4 Sep 2025
The council decided to proceed with the new plant.
Oct 2025
The design and build contract was confirmed.
Jan 2026
Earthworks began and construction started.
30 Jun 2026
The second major concrete pour for the reactor floor slabs was completed.
29 Jul 2026
The 78 precast wall panels for the reactor tanks were installed.
2028
The plant is expected to be operating in early 2028 after commissioning.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll