Te Awaparahi Bay Expansion and Resilience Project
The Te Awaparahi Bay Expansion and Resilience Project is the largest infrastructure project in Lyttelton Port's history. It adds a 388-metre deepwater wharf and a five-hectare container terminal on reclaimed land at Te Awaparahi Bay, served by four new ship-to-shore cranes and semi-automated yard cranes. The new terminal will take ships of up to 15,000 TEU and lift annual berth capacity to around 850,000 TEU. The port says the Cashin Quay container berths, damaged in the Canterbury earthquakes, may not survive another large quake, and most container ships now being built would not fit the current layout. Dredging of the berth pocket is due to start in late 2026, wharf construction is set to begin in mid-2027, and the project is expected to be finished by 2031.
Timeline
2026
Dredging of the berth pocket is due to start in late 2026.
17 Aug 2026
Lyttelton Port Company confirmed an $821 million investment in the expansion.
1 Sep 2026
An expression of interest for wharf construction was released to the market.
2027
Wharf construction is due to start in mid-2027.
2031
The project is expected to be complete by 2031.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll