Takurua Recreation and Wellbeing Centre
- Sector
- Education
- Location
- Kirkwood Avenue, University of Canterbury, Upper Riccarton, Christchurch, Canterbury
- Started
- 2025
- Completed
- Under construction
Takurua will replace the University of Canterbury's 50-year-old Recreation Centre with a building nearly twice its size on Kirkwood Fields. It includes two indoor courts, a main gym and a women's gym, spin and group fitness rooms, studios for arts and clubs, a bouldering wall, counselling and physio rooms, and student social spaces. Outside will be a floodlit full-size artificial pitch and a plaza. Construction began in July 2025 with extensive ground improvement. By August 2026 most of the roof was on and work had moved inside. The centre is due to open in 2027.
Jul 2025
Construction start
2
Indoor courts
2027
Opening
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll