Queenstown Airport Heavy Taxiway and Runway Upgrade
The heavy taxiway and runway upgrade is the largest airfield investment in Queenstown Airport's history. A new 1,600-metre Code C taxiway is being built alongside the main runway so landing aircraft can return to the apron, and departing aircraft can reach the runway threshold, without backtracking along the runway. The work also includes a full overlay of the main runway to extend its life. The runway is not being lengthened and no larger aircraft will be introduced. Work started at the Shotover end of the airfield and runs in day and night stages so the airport stays open. The first sod was turned on 14 July 2026, and the airport has targeted completion for mid-2027.
Timeline
13 May 2026
The airport confirmed plans for the heavy taxiway, with construction expected to begin in July.
14 Jul 2026
The first sod was turned and construction started.
2027
Completion is targeted for mid-2027.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll