Poroti Water Treatment Plant Upgrade
The Poroti Water Treatment Plant treats water from the Poroti Spring and supplies Poroti, Maungatapere, parts of Raumanga and Maunu, and Whangārei Hospital. The upgrade adds new storage tanks, pumps, filtration to remove fine particles, new disinfection, backup power, sludge ponds and upgraded controls, so the plant can cope with muddy water after heavy rain and also treat water from the Wairua River. The $45 million upgrade follows an August 2025 water agreement recognising iwi links to the Poroti Springs, and is meant to improve drought resilience for Whangārei's supply. The construction contract was due to be awarded in October 2026, with earthworks starting in the 2026 construction season and work running to November 2028.
Timeline
Aug 2025
A water agreement with iwi over the Poroti Springs was reached, with a $45 million plant upgrade planned.
Oct 2026
The construction contract was expected to be awarded, with earthworks to start in the 2026 construction season.
Nov 2028
Work is scheduled to finish in November 2028.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll