Ngākōroa Railway Station
- Sector
- Transport
- Location
- Drury West, south of the SH22 (Karaka Road) and Jesmond Road intersection, Auckland, Auckland
- Started
- 2025
- Completed
- Under construction
Ngākōroa is the third new station on the line between Papakura and Pukekohe. It sits in Drury West, just south of the Karaka Road and Jesmond Road intersection, where it was first known as Drury West station. Its name comes from a nearby stream of cultural significance. The station will have two 150 m side platforms, long enough for six-car trains, joined by a pedestrian bridge over the tracks. Construction began in December 2025, and the station is due to open in the first half of 2027. The forecast cost of all three new stations, including land, is about $450 million.
2 × 150 m
Platforms
6-car
Train length
~$450m
Cost of all three new stations
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll