Mt Cass Wind Farm
Mt Cass Wind Farm is being built on a 7.5km ridge on Mt Cass, about 5km east of Waipara in North Canterbury. Its 22 turbines will have a combined capacity of 94.6MW and are expected to produce more than 300GWh a year, enough for about 40,000 households. The project was first proposed in 2006 and gained consent through the Environment Court in 2011, but stalled for years before it changed hands in December 2025. Main construction began on 6 January 2026 with a site compound, laydown area and access roads to the top of the ridge. The turbines are due to arrive at Timaru Port in mid-2027, and the wind farm is expected to start operating in 2028.
Timeline
Dec 2011
The Environment Court granted consent for a modified design.
18 Dec 2025
The project was sold to a new owner, with construction expected to start in early 2026.
6 Jan 2026
Construction started at the site entrance with a compound and laydown area.
2027
Turbines are due to arrive at Timaru Port in July or August 2027.
2028
The wind farm is expected to start operating in 2028.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll