Huntly Battery Energy Storage System Stage 2
The second stage of the Huntly battery adds 100MW of capacity and 200MWh of storage at Huntly Power Station, the country's largest power station. It sits alongside the first-stage battery and brings the site total to 200MW and 400MWh, connected to the grid through the Transpower substation at Huntly. The final investment decision was made in April 2026 on an estimated cost of about $106 million, described as the lowest-cost committed grid-scale battery in New Zealand so far. Construction was expected to begin in the second quarter of the 2027 financial year, with commercial operation targeted for the third quarter of the 2028 financial year.
Timeline
2026
Construction is expected to begin in the second quarter of the 2027 financial year.
17 Apr 2026
The final investment decision was made on the second-stage battery.
2028
Commercial operation is targeted for the third quarter of the 2028 financial year.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll