Helios Ongaonga Solar Farm
The Helios Energy solar farm is planned for about 240 hectares of farmland on Taylor Road, Ongaonga, near the Ongaonga Golf Club in Central Hawke's Bay. More than 200,000 solar panels, up to 2.8 metres high, would produce enough electricity for the equivalent of about 29,000 homes a year, with sheep grazing around the panels. The $150 million project gained resource consent in September 2025 after an independent commissioner's decision, with conditions to meet before work begins. Construction is planned to start in 2027 and take about 12 months, creating around 150 jobs. The site will be screened with native planting and the farm has a planned life of 35 years.
Timeline
Sep 2025
Resource consent was granted after an independent commissioner's decision.
2027
Construction is planned to start in 2027 and take about 12 months.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll