Glenbrook Ohurua Battery 2
Glenbrook Ohurua Battery 2 is a 200MW grid-scale battery on industrial land leased from New Zealand Steel at Glenbrook in South Auckland, next to the first Glenbrook battery. It will store up to 400MWh, enough to supply about 88,000 homes for around two hours at peak times, and about 132,000 homes together with the first battery. The battery is made up of 112 lithium-ion units covering an area about the size of two rugby fields, connected directly to the national grid. Construction began in February 2026 and the battery is expected to be operating in 2028, storing power when it is cheap and plentiful and releasing it during peaks.
Timeline
Feb 2026
Construction began.
2028
The battery is expected to be operating in 2028.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll