Fergusson North Wharf Extension
The Fergusson North Wharf Extension completes the last phase of a 10-hectare reclamation at the Port of Auckland's Fergusson Container Terminal, first consented in 2001. A 45-metre wharf extension on reinforced concrete piles will close the gap between the existing wharf and its mooring dolphin, so quay cranes can reach the full length of a ship's holds. The work will let the port handle container ships of up to 10,000 TEU, about 350 metres long, up from a current limit of around 5,000 TEU. It was fast-track approved in August 2025 together with the Bledisloe North wharf, as part of a programme of nearly $200 million. Works started in November 2026, channel deepening is due to begin in 2027, and everything is expected to be finished in late 2027.
Timeline
21 Aug 2025
The extension was approved under the Fast-track Approvals Act, along with the Bledisloe North wharf.
5 Nov 2026
The port announced that works to complete the Fergusson reclamation and extend the wharf were underway.
2027
Channel deepening is scheduled to begin in 2027.
2027
The reclamation, wharf extension and dredging are expected to be completed in late 2027.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll