
Drury Railway Station
- Sector
- Transport
- Location
- Off Waihoehoe Road, Drury, Auckland, Auckland
- Started
- 2024
- Completed
- 2026
Drury Railway Station is one of three new stations on the line between Papakura and Pukekohe, built to serve the housing growing up across south Auckland. Drury had been without scheduled passenger trains since its original station closed in 1972. The station has two platforms linked by an overbridge, and a covered entrance with ticket gates. There are 350 park-and-ride spaces, with room to add more, plus pick-up and drop-off areas, bike and motorbike parking, and bus connections. It opened to passengers on 2 August 2026, the same day as Paerātā. Once City Rail Link services started, trains began running every 10 minutes at peak.
350
Park-and-ride spaces
2
Platforms
~$300m
Cost with Paerātā station
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll