Downtown Christchurch
Downtown is a $130 million mixed-use precinct planned for the former Bedford Row site in central Christchurch, on the block between Cashel, Manchester and Lichfield streets. It is designed to link Cashel Mall with the new stadium at Te Kaha along a pedestrian-focused Bedford Row. The plans include 18 three- and four-storey buildings with shops and hospitality on the ground floor and homes or offices above, plus two five-level residential buildings with 64 apartments. There are also 23 penthouse apartments and an open-air lane for dining and shopping. Resource consent was lodged in May 2025, construction was scheduled to start in April 2026 and completion is targeted for October 2027.
Timeline
May 2025
The precinct was announced and resource consent was lodged.
Apr 2026
Construction was scheduled to start.
Oct 2027
Completion is targeted for October 2027.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll