Downtown Christchurch

Have a better image?

Downtown is a $130 million mixed-use precinct planned for the former Bedford Row site in central Christchurch, on the block between Cashel, Manchester and Lichfield streets. It is designed to link Cashel Mall with the new stadium at Te Kaha along a pedestrian-focused Bedford Row. The plans include 18 three- and four-storey buildings with shops and hospitality on the ground floor and homes or offices above, plus two five-level residential buildings with 64 apartments. There are also 23 penthouse apartments and an open-air lane for dining and shopping. Resource consent was lodged in May 2025, construction was scheduled to start in April 2026 and completion is targeted for October 2027.

Timeline

  1. May 2025

    The precinct was announced and resource consent was lodged.

  2. Apr 2026

    Construction was scheduled to start.

  3. Oct 2027

    Completion is targeted for October 2027.