The Dannevirke Solar and Energy Storage Project is planned for 173 hectares of rural land off Top Grass Road, about 6km west of Dannevirke in the Tararua District. The 119MW solar farm would supply the equivalent of about 26,000 homes, and the design allows for a battery of up to 91MW and 200 to 400MWh. Resource consent was granted in November 2024, and a further consent for a 50-hectare extension is planned for 2026. The project is aiming to be ready to build in early 2027, with financial close and notice to proceed targeted that year. Construction is expected to take 12 to 18 months.
Timeline
Nov 2024
Resource consent was granted.
2027
Financial close and notice to proceed are targeted for 2027, with construction expected to take 12 to 18 months.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll