Christchurch Wastewater Treatment Plant Activated Sludge Reactor
The activated sludge reactor replaces the trickling filters at the Christchurch Wastewater Treatment Plant in Bromley, which were destroyed by fire in 2021 and caused years of odour in the city's east. The new reactor measures 67m by 67m and stands 7m high, with a blower hall that mixes air into incoming wastewater, new pipelines and upgraded pumps. The work is expected to fix the odour problems, cut greenhouse gas emissions and serve a growing population. It has an estimated cost of $140 million, partly covered by an $85 million insurance settlement. Construction began with bulk earthworks in February 2026, the concrete reactor started in August 2026, and commissioning is targeted for 2028.
Timeline
21 Nov 2024
Demolition of the fire-damaged trickling filters started.
Nov 2025
The main construction contract was awarded.
Feb 2026
Construction started with bulk earthworks.
Aug 2026
Construction of the concrete reactor structure started.
2028
Commissioning is targeted for 2028.
Project team
- Client / DeveloperUnclaimedClaim this role →
- Project ManagerUnclaimedClaim this role →
- Quantity SurveyorUnclaimedClaim this role →
- ArchitectUnclaimedClaim this role →
- Structural EngineerUnclaimedClaim this role →
- Building Services EngineerUnclaimedClaim this role →
- Civil EngineerUnclaimedClaim this role →
- Fire EngineerUnclaimedClaim this role →
Build team
- Main ContractorUnclaimedClaim this role →
- Mechanical ContractorUnclaimedClaim this role →
- Electrical ContractorUnclaimedClaim this role →
- Steel FabricatorUnclaimedClaim this role →
- Concrete ContractorUnclaimedClaim this role →
- PlumberUnclaimedClaim this role →
Products used
Drag to scroll